MORE MATERIALS. BETTER QUESTIONS.
A material for the requirement.
Not just for the appearance.
Families and grades to consider for your project. Exact availability and manufacturability are confirmed after assessing the material, geometry and intended use. Not every grade is suitable for every job.

Prototypes and indoor parts
PLA · PLA 850 · HR-870 · High Speed
Detail, models and fit checks. Engineering and high-speed grades have their own processing requirements.

Functional components
PETG
Brackets, housings and components. Sustained loads, moisture and operating temperature are assessed.

Environment and temperature
ABS · ASA
Options for technical parts; ASA is a common outdoor candidate. Material, geometry and thermal control are assessed together.

Tailored flexibility
TPU · Filaflex · FleX-920
From firmer options to very soft grades. FleX-920 is a copolyester, not TPU. We confirm hardness and processing suitability.

Mechanisms and specialist uses
PA / Nylon · PP
Toughness, wear, repeated flexing or specific chemical requirements. The grade and application guide the choice.

Stiffness and stability
PETG-CF · PA-CF · PA-GF · PP-GF
Carbon- or glass-filled compounds for particular requirements. Higher stiffness does not automatically mean greater impact resistance.

Low weight and texture
PLA-LW · Filaflex Foamy · wood · cork
Foaming grades and specialist finishes to assess individually. Process, geometry and expectations need to suit the formulation.

Geometry and specialist functions
PVA · HIPS · Easy Off · FR grades
Soluble or breakaway supports and specialist formulations. The pairing and grade conditions are assessed for the project.
Need help narrowing it down?
Our guide explains the trade-offs and includes a material selector.
Open guide and selectorNeed a material that is not in the selector? Mention it in your project details.
A CLEAR WORKFLOW
Understand it first.
Then manufacture it.
01Enquiry
Send the model, required quantity and operating requirements.
02Review and proposal
We assess manufacturability, material, geometry and additional operations.
03Quote and approval
We confirm scope, price and estimated lead time before manufacturing.
04Manufacturing and delivery
We manufacture as agreed and arrange shipment of the completed work.
Lead time is assessed for the project. Preparation, manufacturing and transit are separate stages; complexity and unexpected issues may affect the estimate.